Reed Contact
Mark Ardouin
Reed Division
Health
Project Location
Randwick, NSW
Project Client
Healthscope
Project Engineer
Umow Lai
Project Start Date
TBA
Duration of Construction
Stage 1 - 4 weeks, Stage 2 - 20 weeks
Contract Type
AS2164 with special conditions
Stage 1 involves the construction of new offices, reception, tea room and recovery areas. The works involved in Stage 2 are construction of two new operating theatres, scrub rooms anaesthetics bays, staff station, 17 bed recovery bay CSSD upgrade and new change rooms.
Staged project working within a fully functioning hospital environment including working close to operating theatres and managing patient flows.
Detailed review with the client on patient flows to allow seamless installation of temporary hoardings and early involvement with the designers to achieve cost savings to offset variation costs. To minimise noise and vibration concerns, drilling into the concrete slabs changed from percussion drilling to core drilling to allow installation of structural steel components. Early identification of services shut downs to limit the impact on the hospital.
Close attention to noise and dust control.