Construction of external sitting areas to ground and first floor. Renewal of existing aluminum windows and complete refurbishment of northern elevation of building.
Design and construction of 18 bed Transitional Care Unit including Patient bedrooms, lounge, dining facilities, courtyards, treatment rooms, gymnasium, etc offices, port cochere.
Refurbishment of existing club facilities, such as new bistro, poker machine lounge, main bar and painting of the external facade as well as the construction of a new building area to house kitchen and toilet facilities.
Refurbishment of the existing club. Some of the works includes new external walls and roof and an improved internal layout.
Addition to existing club including new office, conference and toilet areas.
The works includes the refurbishment of the ground floor of the southern building and the construction of a new peri-operative unit above the existing medical records.
The refurbishment of the existing club facilities. some of the works include ac omplete re-fit of the existing kitchen and refurbishment of the existing dining room to give a modern contemporary style.
Construction of new bridges over the Pages River and Campbells Creek and culvert extensions at Scone including extensive roadworks and intersection reconstruction.
This project involves the construction of all civil works on the site, including earthworks, reservoirs, tanks, buildings for the treatment unit, the amenities/control area, chemical dosing equipment and the main pumping stations, which includes...
The project involves augmentation of the existing sewage treatment plant which is a combination of a conventional type trickling filter plant plus an activated sludge plant consisting of two Pasveer channels. The upgrade works includes removal...
Decommissioning and upgrading a water treatment plant from 50ML to 100ML/day capacity of water to supply clean water the Tweed Shire Council and to meet future population growth within the Shire. The upgrade has a capability to be expanded to...
Refurbishment of the existing building. some of the works includes the construction of ground level Cafe and bistro, additional toilet facilities, midifications to the existing reception, refurbishment of the atrium (Level 1 and 2) and upgrading...
Construction of lift shaft adjacent to the Cahill Expressway. Some of the works includes earthworks, steel frame erection, glass cladding & associated works.
Renovation to existing shopping centre, new food court, new Coles supermarket and also extension and additional carparking, demolition and creation of new mall areas.
Complete demolition of all internal services and finishes. Construction of new lift shaft and internal staircase. Also being constructed are 4 new bar areas and 2 new kitchens complete with new services including toilets, cool rooms, and offices....
The Construction of a new Mental Health Facility located on approximately 5.4 hectares of the Concord Repatriation General Hospital. The facility includes the construction of twelve new structures to accommodate a range of mental health...
Refurbishment of ground floor which included a 500 meter square extension. The new extension involved demolition of existing and construction of new sports bar and back of house areas that are used for storage, offices and boardrooms. A gaming...
The works involved the addition of 1100m˛ of new floor area; the refurbishment of a further approximately 2200m˛ and a new 175 space car-park. This consisted of a slab on ground; 47 tonne of structural steelwork; 1100m˛ of deck roof sheeting;...
The augmentation of the existing Evans Head STP is based on the replacement of the existing plant with two new IDEA tanks, sludge storage tanks, inlet works, pumping stations, chemical dosing facilities, amenities and electrical buildings....
Provison of additional pedestrian & cyclist facilities to improve access between Neutral Bay, Crows Nest and North Sydney business centres. Some of the works involved are earthworks, excavation of footings, rock anchors, precast elements bridge...