Reed Division
Water
Project Location
Greystanes, NSW 2145
Project Client
Boral, Sydney Water Corporation
Project Engineer
Connell Wagner
Project Start Date
17-12-2001
Duration of Construction
45 weeks
Project Value
$8.5 Million (Inclusive of GST)
Contract Type
AS2124 - 1992 Design and Construct
Design and construction of water pumping station and "wine glass" steel elevated reservoir. The augmented pump station operates to deliver water to the existing Elevated Reservoir (WS095) and the new Elevated Reservoir (WS0463) on Prospect Hill.