Filter Results by:
Division:
State:





Project Facts


Reed Contact

Arne Leonard

Reed Division

Water

Project Location

Bowral, NSW 2576

Project Client

Department of Commerce

Project Start Date

16-12-2004

Duration of Construction

77 weeks

Project Value

$12.3 Million (Inclusive of GST)

Contract Type

GC21


Bowral Sewerage Treatment Plant

The project involves augmentation of the existing sewage treatment plant which is a combination of a conventional type trickling filter plant plus an activated sludge plant consisting of two Pasveer channels. The upgrade works includes removal and disposal of contaminated wastes (sludge and screenings), construction of four drying beds, four pump stations, inlet works with screening and flow measurement, 3.7ML aeration tank (IDEAT), 17ML storm detention pond, 7.8ML catch balance pond, tertiary filters (cloth media system), UV disinfection system, connecting pipeworks and 1.8km of effluent discharge main. The works were broken down into milestones with the above part being one