Reed Contact
Arne Leonard
Reed Division
Water
Project Location
Bowral, NSW 2576
Project Client
Department of Commerce
Project Start Date
16-12-2004
Duration of Construction
77 weeks
Project Value
$12.3 Million (Inclusive of GST)
Contract Type
GC21
The project involves augmentation of the existing sewage treatment plant which is a combination of a conventional type trickling filter plant plus an activated sludge plant consisting of two Pasveer channels. The upgrade works includes removal and disposal of contaminated wastes (sludge and screenings), construction of four drying beds, four pump stations, inlet works with screening and flow measurement, 3.7ML aeration tank (IDEAT), 17ML storm detention pond, 7.8ML catch balance pond, tertiary filters (cloth media system), UV disinfection system, connecting pipeworks and 1.8km of effluent discharge main. The works were broken down into milestones with the above part being one